How to do each maintenance job in SiteWise
By Vimal Bhaya, Founder and Lead Systems Architect · Last reviewed 24 November 2026
Ten guides, one job each: bring your equipment in, tag it, put it on PM schedules, close work orders with no signal, take requests from the whole site and see every site's overdue work. Then a full example on a rooftop unit, and three guides for when you start running parts and tools.
Each guide shows the paper binder way first, then the SiteWise way, tap by tap, beside the phone screen.
The 10 parts, in order
The first three set a site up. The next three are the jobs a maintenance team does every day. Part 7 is a full example on one rooftop unit. The last three are inventory management: parts and tools, for when you are ready to run a storeroom in SiteWise.
-
1. How to turn your equipment spreadsheet into an asset list
Send it as it is and we import it free, or add a machine on the phone in five steps.
Read part 1 -
2. How to tag equipment with QR codes
Make the code, stick it where a technician looks, and scan it to open the right machine.
Read part 2 -
3. How to set up a preventive maintenance schedule
The work order template, how often it repeats and how early each work order opens.
Read part 3 -
4. How to close a work order offline, with no phone signal
Tick the steps, add photos, reconcile parts and tools, and complete it, all offline.
Read part 4 -
5. How staff report a maintenance problem
Scan the room's QR code and fill in a web form. A manager approves it into a work order. No app, no account.
Read part 5 -
6. How to see every site's overdue work on one screen
Each team's overdue count on the dashboard, and every overdue job in one filter.
Read part 6 -
7. Example walkthrough: SiteWise CMMS in action: rooftop HVAC preventive maintenance, the schedule and how to set it up
One rooftop unit, start to finish: the maker's quarterly and seasonal checks, set up as three PMs.
Read part 7 -
8. How to make sure the parts and tools are on the shelf before a PM or work order (inventory management)
Parts and tools on the job, reserved ahead, and picked up together with one QR ticket.
Read part 8 -
9. Calculating the correct minimum and maximum stock levels for a spare part in a maintenance CMMS
The formula and a worked example, then the numbers set per storeroom, with a warning in days.
Read part 9 -
10. How to check a tool out to a job and get it back
Booked on the job, issued with one scan, and verified back in by the crib.
Read part 10
How to use this
Read them in order if you are starting from scratch. That is the usual path. If you already know which piece you need, jump to it from the list above.
