How to make sure the parts and tools are on the shelf before a PM or work order (inventory management)
By Vimal Bhaya, Founder and Lead Systems Architect · Last reviewed 24 November 2026
This is a continuation of How to do it in SiteWise, a 10-part tutorial. You are on part 8 of 10.
Put the parts and tools on the job itself: on the PM, or on any work order. SiteWise then reserves the parts for work orders due in the next 30 days, holds them for PM work orders even before those exist, and books the tools for the day. The part's ledger shows the day a storeroom would run short, and on the day the technician picks up the parts and tools together with one QR ticket.
The binder way is checking the shelf and the tool board the morning of the job
- Look up the PM sheet the week before, if someone remembers.
- Walk to the shelf and count, then check the tool board for the meter or the ladder the job needs.
- If it is short, call the supplier and move the PM.
- Bag the parts with the work order number on it, and ask around for the tool.
- Hope nobody takes them for a breakdown first.
Putting a job's parts and tools together before the job is called kitting. Done by hand, it depends on someone looking ahead every week.
The SiteWise way: parts and tools on the job, reserved ahead, picked up with one scan
Why inventory management? This is not an afterthought! A critical emergency repair or a scheduled PM work order can't be done without the spare parts or tools. Imagine doing a pump repair on a legacy pump that needs a washer of a special thickness.
Any work order can reserve parts and tools, not only a PM. The steps below use a PM as the example.
On the phone
- Open the PM (Workorders, then Preventative) and, on Work Order Template, tap Add part.
- Pick the part, the storeroom to pick it from and how many. Pick up by can be anyone assigned, or chosen people.
- Add the tools the same way, under Add tool, and save the PM.
- For a one-off job, do the same on the work order itself, under Required parts and Required tools.
- Check the reservation windows: Config, Inventory Management, More, Settings, Defaults. Parts are reserved for work orders due within the auto-reserve window.
- Set the tool auto-reserve window in days, so required tools are held for work orders due that soon.
- Open the part and tap Part consum. The lines after today are the coming PMs, each with what will be left.
- If a storeroom would reach zero before a PM, order now from the reorder alert on the inventory dashboard.
- On the day, the technician opens Pick up on the dashboard. One QR code covers every work order's parts and tools at that crib.
- The attendant scans it and issues the parts and tools together.
* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.
What you end up with is a warning weeks ahead, not on the morning
Parts: reorder alerts, with the date to order by
Tools: booking clashes, days ahead
* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.
We make it simple! SiteWise calculates reorder dates from existing work orders, preventive maintenance projections and vendor lead times.
| The check | Checking the shelf | SiteWise |
|---|---|---|
| Who else can see it | The person who counted | The storeroom sees every reserved part, and the technician sees the pick-up waiting |
| Can you prove it | A bag with a number on it | Each part and tool reserved, issued and returned, against the work order |
| Does anything chase it | No | The ledger warns when a storeroom's balance would drop below zero before a PM, and tool clashes show days ahead |
Reservations follow the due dates, so keep a minimum for breakdowns
SiteWise reserves parts for the work orders due inside the window, and holds them for PMs before their work orders exist. A breakdown opened today takes what is available today. Keep a minimum on each part for the unplanned jobs, on top of what is reserved: see how to calculate min and max levels for a part.