Inventory management

How to make sure the parts and tools are on the shelf before a PM or work order (inventory management)

By Vimal Bhaya, Founder and Lead Systems Architect · Last reviewed 24 November 2026

This is a continuation of How to do it in SiteWise, a 10-part tutorial. You are on part 8 of 10.

Put the parts and tools on the job itself: on the PM, or on any work order. SiteWise then reserves the parts for work orders due in the next 30 days, holds them for PM work orders even before those exist, and books the tools for the day. The part's ledger shows the day a storeroom would run short, and on the day the technician picks up the parts and tools together with one QR ticket.

The binder way is checking the shelf and the tool board the morning of the job

  1. Look up the PM sheet the week before, if someone remembers.
  2. Walk to the shelf and count, then check the tool board for the meter or the ladder the job needs.
  3. If it is short, call the supplier and move the PM.
  4. Bag the parts with the work order number on it, and ask around for the tool.
  5. Hope nobody takes them for a breakdown first.

Putting a job's parts and tools together before the job is called kitting. Done by hand, it depends on someone looking ahead every week.

The SiteWise way: parts and tools on the job, reserved ahead, picked up with one scan

Why inventory management? This is not an afterthought! A critical emergency repair or a scheduled PM work order can't be done without the spare parts or tools. Imagine doing a pump repair on a legacy pump that needs a washer of a special thickness.

Any work order can reserve parts and tools, not only a PM. The steps below use a PM as the example.

On the phone

  1. Open the PM (Workorders, then Preventative) and, on Work Order Template, tap Add part.
  2. Pick the part, the storeroom to pick it from and how many. Pick up by can be anyone assigned, or chosen people.
  3. Add the tools the same way, under Add tool, and save the PM.
  4. For a one-off job, do the same on the work order itself, under Required parts and Required tools.
  1. Check the reservation windows: Config, Inventory Management, More, Settings, Defaults. Parts are reserved for work orders due within the auto-reserve window.
  2. Set the tool auto-reserve window in days, so required tools are held for work orders due that soon.
  1. Open the part and tap Part consum. The lines after today are the coming PMs, each with what will be left.
  2. If a storeroom would reach zero before a PM, order now from the reorder alert on the inventory dashboard.
  1. On the day, the technician opens Pick up on the dashboard. One QR code covers every work order's parts and tools at that crib.
  2. The attendant scans it and issues the parts and tools together.

* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.

What you end up with is a warning weeks ahead, not on the morning

Parts: reorder alerts, with the date to order by

Tools: booking clashes, days ahead

* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.

We make it simple! SiteWise calculates reorder dates from existing work orders, preventive maintenance projections and vendor lead times.

The checkChecking the shelfSiteWise
Who else can see itThe person who countedThe storeroom sees every reserved part, and the technician sees the pick-up waiting
Can you prove itA bag with a number on itEach part and tool reserved, issued and returned, against the work order
Does anything chase itNoThe ledger warns when a storeroom's balance would drop below zero before a PM, and tool clashes show days ahead

Reservations follow the due dates, so keep a minimum for breakdowns

SiteWise reserves parts for the work orders due inside the window, and holds them for PMs before their work orders exist. A breakdown opened today takes what is available today. Keep a minimum on each part for the unplanned jobs, on top of what is reserved: see how to calculate min and max levels for a part.

Put one storeroom on SiteWise today

The free plan holds 250 parts, 100 tools and 100 PMs. Send us your parts list and PM schedule and we import both, free.

Common questions

How do I make sure parts are available for preventive maintenance?

Put the parts on the PM, reserve them ahead, and watch the projected balance. SiteWise does all three: the PM carries its parts, they are reserved for work orders due in the next 30 days, and the ledger warns when a storeroom would run short.

Does this work for work orders that are not PMs?

Yes. Add parts and tools to any SiteWise work order under Required parts and Required tools. Parts are reserved for work orders due inside the auto-reserve window, and tools for work orders due inside the tool window.

Can SiteWise hold tools as well as parts?

Yes. A tool on a SiteWise work order is booked for that work order's date, and a clash shows when more units are booked than you have. It is picked up on the same QR ticket as the parts.

Does SiteWise reserve parts for PM work orders that do not exist yet?

Yes. SiteWise looks ahead and holds parts for PM work orders inside the reservation window, including ones not created yet, so the storeroom sees what is coming.

What is kitting in maintenance?

Putting a job's parts and tools together before the job, so the technician does not stop halfway to fetch something. In SiteWise the reservation and the pick-up ticket do the kitting.

What is a pick-up ticket?

A QR code in the SiteWise app that lists every part and tool waiting for a technician at one crib, across their work orders. The attendant scans it and issues them together.

Have the parts waiting, not missing

SiteWise reserves each PM's parts ahead and warns you weeks before a shelf runs short.

Moving off a spreadsheet? Send us your spreadsheet or export; we import it for you, free, usually in 2 to 4 business days. Email it to us

Download the app free

Download on the App StoreGet it on Google Play

Free on iPhone and Android.

Vimal Bhaya, Founder and Lead Systems Architect, Renergy Technologies.
He spent about a decade designing the analog circuits inside enterprise server chips at Oracle, from high-speed data links to DDR4 memory systems. He now designs the sensors and the detection models behind TemperatureWise.
Sources
  • Reorder dates calculated from existing work orders, preventive maintenance projections and vendor lead times: the SiteWise team, 25 November 2026
  • Auto-reserve for planned PMs inside a 30-day window, look-ahead reservation for PM work orders not created yet, the consumption ledger with future PM projections and its warning, pick-up tickets and the crib counter: SiteWise parts and inventory
  • SiteWise plans and limits: unlimited work orders, 100 PMs, 20 locations, 250 assets, 250 parts, 100 tools and 25 vendors on the free plan, and no limit on users: SiteWise plans and pricing