Inventory management

Calculating the correct minimum and maximum stock levels for a spare part in a maintenance CMMS

By Vimal Bhaya, Founder and Lead Systems Architect · Last reviewed 24 November 2026

This is a continuation of How to do it in SiteWise, a 10-part tutorial. You are on part 9 of 10.

The minimum is what you use while a new order is on its way, plus a safety margin. The maximum is the minimum plus one normal order. A filter used 4 times a month, with a 2-week lead time and a margin of 2, gets a minimum of 4, and a maximum of 16 if it comes by the case of 12. In SiteWise each storeroom gets its own minimum and maximum, and the part shows Below Min, with a reorder alert, as soon as stock drops under it.

The minimum covers the wait for a delivery, and the maximum adds one order

A minimum (also called a reorder point) is the count at which you order more. It has to cover what you use while the order is on its way, which is the part's lead time. On top of that, keep a safety margin for a week when two machines fail at once.

For example, a site that uses 4 filters a month, about 1 a week, with a supplier that takes 2 weeks, uses about 2 while it waits. Add 2 for a bad week, and the minimum is 4. If filters come by the case of 12, the maximum is 4 + 12 = 16, so one case fills the shelf from the minimum.

Critical parts, where a missing part stops a line or closes a room, get a bigger margin than parts you can buy across town in an hour.

We make it simple! SiteWise calculates reorder dates from existing work orders, preventive maintenance projections and vendor lead times.

The binder way is a bin card that someone has to keep honest

  1. Write the minimum and maximum on a card on each bin.
  2. Subtract on the card every time a part is taken.
  3. When the count reaches the minimum, tell the buyer.
  4. The buyer orders up to the maximum.

It works while everyone writes on the card. The first night shift that takes a part without writing it down makes the card wrong, and nobody knows until the bin is empty.

The SiteWise way: enter the numbers once per storeroom

On the phone, as a manager or crib attendant

  1. Open Config, then Inventory Management.
  2. Tap Parts, then the part.
  1. On Stock, tap Table. Each storeroom shows what is on hand (QOH), its minimum, its maximum, what is available and what is reserved.
  1. To stock the part in another storeroom, tap Add Location.
  2. Pick the storeroom, then enter what is on the shelf (QOH), the Min and the Max.
  3. Tap Add Location.
  1. When stock drops under the minimum, the part shows in Reorder Alerts on the inventory Dashboard, with its lead time and days left.
  2. Tap Create Purchase Request. Custom integrations for purchase orders, such as with your own purchasing system, are on Enterprise plans.

* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.

What you end up with is a warning before the shelf is empty

The checkBin cardsSiteWise
Who else can see itWhoever walks to the binEveryone with the inventory screens, for every storeroom
Can you prove itThe card, if everyone wrote on itEvery receipt, issue and adjustment in the part's ledger, each adjustment with a reason
Does anything chase itNoBelow Min, a reorder alert and the days each storeroom has left

You set the numbers, and SiteWise shows you what to base them on

SiteWise holds the evidence for a good minimum: the lead time on each part, a ledger of what each storeroom used, and a warning of how many days each storeroom has left at the current rate. Look at those once a quarter and move a minimum when it no longer fits.

Parts that the coming PMs and work orders need are reserved ahead, which is a separate job from the minimum: see how to have the parts and tools ready before a PM or work order.

Put one storeroom on SiteWise today

The free plan holds 250 parts and 100 tools. Send us your parts list and we import it free, with a minimum and maximum per storeroom.

Common questions

What are min and max levels for a spare part?

Two numbers per part per storeroom. The minimum is the count at which you order more. The maximum is the most you want on the shelf, so an order brings the stock back up to it.

How do I calculate the minimum and maximum for a part?

Minimum: what you use per week, times the lead time in weeks, plus a safety margin. Maximum: the minimum plus the quantity you normally order at once.

A part used about once a week with a 2-week lead time needs 2 to cover the wait. With a margin of 2, the minimum is 4; bought by the case of 12, the maximum is 16.

Can each storeroom have its own minimum and maximum?

Yes. In SiteWise the minimum and maximum are set per storeroom, so a main storeroom and a small satellite shop each keep their own levels.

What does Below Min mean in SiteWise?

That storeroom's available count has dropped under its minimum. SiteWise shows the part in the reorder alerts, with its lead time and how many days are left, and a button to create a purchase request.

How many parts does the SiteWise free plan hold?

250 parts and 100 tools, with unlimited work orders. Premium has no limits.

Know what to order before the shelf is empty

Each storeroom keeps its own minimum, and SiteWise warns you in days, not after the fact.

Moving off a spreadsheet? Send us your spreadsheet or export; we import it for you, free, usually in 2 to 4 business days. Email it to us

Download the app free

Download on the App StoreGet it on Google Play

Free on iPhone and Android.

Vimal Bhaya, Founder and Lead Systems Architect, Renergy Technologies.
He spent about a decade designing the analog circuits inside enterprise server chips at Oracle, from high-speed data links to DDR4 memory systems. He now designs the sensors and the detection models behind TemperatureWise.
Sources
  • Reorder dates calculated from existing work orders, preventive maintenance projections and vendor lead times: the SiteWise team, 25 November 2026
  • Custom integrations on Enterprise plans: SiteWise plans and pricing
  • SiteWise parts: minimum and maximum per storeroom, lead time, below-minimum badge, receiving and adjusting with a mandatory reason, the consumption ledger and purchase orders: SiteWise parts and inventory
  • The worked example on this page uses example figures to show the arithmetic
  • SiteWise plans and limits: unlimited work orders, 100 PMs, 20 locations, 250 assets, 250 parts, 100 tools and 25 vendors on the free plan, and no limit on users: SiteWise plans and pricing
  • The tap steps: the SiteWise app as designed, read 24 November 2026. The phone screens on this page are drawn with representative data

Last reviewed 24 November 2026.