How-to in SiteWise

How to set up a preventive maintenance schedule

By Vimal Bhaya, Founder and Lead Systems Architect · Last reviewed 24 November 2026

This is a continuation of How to do it in SiteWise, a 10-part tutorial. You are on part 3 of 10.

A PM (preventive maintenance) schedule is a work order template that repeats on a pattern you set: every so many days, weeks or months, or a set time after the last one was done. Write the job once, pick how often it repeats, and set how early each work order opens. In SiteWise: open Workorders, then Preventative, tap +, fill in the work order template, then the trigger settings. It is 14 steps on the phone, done once, and from then on SiteWise opens every work order by itself.

The binder way takes six steps, and only the calendar reminds anyone

Most teams start with a wall calendar and a tickler file: a folder for each month, holding the PM sheets due then.

  1. Write the PM sheet: the machine, the job, the parts.
  2. Pick a frequency and write the next due date on the calendar.
  3. File a copy in the folder for that month.
  4. Check the folder every Monday.
  5. Hand the sheet to a technician.
  6. When it comes back signed, work out the next date and write it on the calendar again.

It works for a few machines and one careful person. It stops working when that person is away, because nothing else knows the PM is due.

The SiteWise way is 14 steps, done once

A SiteWise PM schedule has two parts. The work order template is the job: its title, the machine, the parts and the tools. The trigger settings say how often it repeats and when each work order opens.

On the phone, as a manager

  1. Open Workorders in the tab bar.
  2. Tap Preventative at the top. Your PM schedules are listed, each with how often it repeats.
  3. Tap the blue +.
  1. On Work Order Template, type a title that starts with the machine's name, such as "RTU 3: quarterly service".
  2. Add a short description, and a photo if it helps the technician find the machine.
  3. Pick the Location, then the Asset. The asset list shows only the equipment at that location.
  1. Under Required parts, tap Add part. Pick the part, the storeroom to pick it from and how many. Add tools the same way under Add tool. SiteWise reserves these parts and tools before each work order is due: see how to have the parts and tools ready before a PM or work order.
  2. Set the priority, then tap Next.
  1. On Trigger Settings, name the schedule and set Starts on. Leave Ends on empty to run it with no end date.
  2. Pick Regularly to keep a fixed calendar, or After Completion to count from the day the last one was closed.
  3. Set Work Order Due: every 3 months, for a quarterly PM.
  4. Set Create Work Orders: how many days before the due date each work order opens, or on a chosen weekday.
  1. Tick Create first work order immediately if the first one is due now, then tap Create PM Schedule.
  2. Open Work Orders. The first work order from the PM is there, with its parts reserved.

* The phone screens show representative data, drawn from the app's design. Text in the real app is smaller, and a screen may differ slightly.

The steps of the job come from the procedure library. Write a checklist there once and add it to the PM, and every work order the PM opens carries those steps. See inspections and checklists for how a checklist is kept up to date.

What you end up with is a schedule that nobody has to remember

The checkWall calendar and tickler fileSiteWise
Who else can see itWhoever stands at the calendarThe whole team, on the phone or on the web
Can you prove it was doneA signature on a sheet in a folderThe closed work order: who did it, when, with photos and the parts used
Does anything chase itOnly the person who checks the folderSiteWise opens each work order before it is due, and it shows as overdue if it slips

The parts on the template matter as much as the dates. SiteWise reserves them for each PM work order before it is due, which is how the parts and tools are ready before a PM or work order.

One PM has one frequency, so a machine with two schedules gets two PMs

A rooftop unit may need a filter check every month and a full service every quarter. Set up two PMs on the same asset, one for each frequency. Start both titles with the machine's name, such as "RTU 3: monthly filters" and "RTU 3: quarterly service", and a search for "RTU 3" finds both. The rooftop unit guide sets up all three of a rooftop unit's PMs this way.

If you look after a handful of machines and one person keeps the calendar, the binder is good enough. SiteWise earns its place when there are more machines, more people or more sites than one calendar can hold.

Set up your first PM today

The free plan holds 100 PMs (preventive maintenance schedules) and unlimited work orders. If your PMs live in a spreadsheet, send it to us and we set them up for you, free.

Common questions

How do I set up a preventive maintenance schedule?

Write the job once, pick how often it repeats, and decide how early each work order should open. In SiteWise that is a PM schedule: Workorders, Preventative, +, then the work order template and the trigger settings.

From then on SiteWise opens each work order before it is due, with the parts and tools on it.

What is the difference between Regularly and After Completion?

Regularly keeps a fixed calendar: a quarterly PM falls every three months from its start date. After Completion counts from the day the last one was closed, so a late job moves the next one back.

Use Regularly where a rule or a contract sets the dates. Use After Completion where the gap between jobs matters more than the date.

How early should a PM work order open?

At least as early as the slowest part on the job takes to arrive. Each SiteWise part records its lead time, and the PM's parts are reserved for its work orders before they open, so a short shelf shows up in time to order.

Does each PM count toward the free plan?

Yes. SiteWise's free plan holds 100 PMs (preventive maintenance schedules), with unlimited work orders and no limit on users. Premium has no limits.

Can a PM carry a checklist?

Yes. Add a procedure from the SiteWise procedure library to the PM, and every work order it opens carries those steps. Edit the procedure once and every PM that uses it takes the change. Work orders already issued keep the version they were issued with.

Put your first PM on a schedule

SiteWise opens each work order before it is due, with the parts held and the steps on it.

Moving off a spreadsheet? Send us your spreadsheet or export; we import it for you, free, usually in 2 to 4 business days. Email it to us

Download the app free

Download on the App StoreGet it on Google Play

Free on iPhone and Android.

Vimal Bhaya, Founder and Lead Systems Architect, Renergy Technologies.
He spent about a decade designing the analog circuits inside enterprise server chips at Oracle, from high-speed data links to DDR4 memory systems. He now designs the sensors and the detection models behind TemperatureWise.
Sources
  • How a SiteWise PM schedule works (the work order template, Regularly or After Completion, due every set number of days, weeks or months, and work orders created a set number of days before the due date): SiteWise preventive maintenance software
  • Checklist templates kept centrally and added to each PM, with issued work orders keeping their version: SiteWise inspections and checklists
  • SiteWise plans and limits: unlimited work orders, 100 PMs, 20 locations, 250 assets, 250 parts, 100 tools and 25 vendors on the free plan, and no limit on users: SiteWise plans and pricing
  • The tap steps: the SiteWise app as designed, read 24 November 2026. The phone screens on this page are drawn with representative data

Last reviewed 24 November 2026.